OASIS Business-Centric Methodology (BCM) TC
Defining methods to acquire interoperable e-business information systems within communities of interest
Completed:
The Technical Committee was closed by the OASIS TC Administrator on 08 November 2016 and is no longer active.Archives of its work remain publicly accessible and are linked from this page. OASIS appreciates the efforts of all those who participated in this TC.
Table of Contents
- Announcements
- Overview
- Subcommittees
- Technical Work Produced by the Committee
- Mailing Lists and Comments
- Additional Information
The BCM team is pleased to announce that the OASIS BCM V1.0 specifications are now recently approved as an OASIS standard specification according to the OASIS approved process.
The purpose of the OASIS Business-Centric Methodology (BCM) TC
is to develop a specification which will provide business managers with
a set of clearly defined methods with which to acquire agile and
interoperable e-business information systems within communities of
interests.
There is a quick overview and introductory brochure on BCM.
A powerpoint presentation (used at the OASIS symposium at New Orleans) explains the
role of BCM when using XML for a Reliable Infrastructure.
A supporting powerpoint presented
at the WWW Semantic Grid Workshop defines the role of BCM when
developing e-business Grid / P2P capabilities.
For more information, see the TC Charter and FAQ
- BCM EPR SC (3 members, 5 documents)
- BCM Liaisons SC (4 members, 1 document)
- BCM Linking + Switching SC (2 members, 1 document)
Technical Work Produced by the Committee
OASIS/Business Centric Methodology Specification V1.0
Appendix A and B on patterns and linking and switching support
Wiki for OASIS BCM TC member collaboration
bcm: the list used by TC members to conduct Committee work. TC membership required to post. TC members are automatically subscribed; the public may view archives.
bcm-comment: a public mail list for providing input to the OASIS bcm Technical Committee members. Send a comment or view archives.
Click here for an Introductory brochure on BCM.
Click here for a brochure introducing the EPR and erpXML work
Additional resources on EPR from the EPRforum website.
Additional whitepapers, wallchart posters and presentation materials maybe found at the BCM resource site.
Providing Feedback: OASIS welcomes feedback on its technical activities from potential users, developers, and others to better assure the interoperability and quality of OASIS work.