OASIS Production Planning and Scheduling (PPS) TC
Developing common object models and schemas for collaborative planning and scheduling in manufacturing
Completed:
The Technical Committee was closed by TC Administration on 03 October 2022 and is no longer active. Archives of its work remain publicly accessible and are linked from this page. OASIS appreciates the efforts of all those who participated in this TC.Table of Contents
PPS Committee Specification (Version 1.0) was approved on September 29th, 2011. The first part of this specification of Core Elements shows XML elements for composing XML documents of planning and scheduling in manufacturing industries. Then the next part for Transaction Messages shows how to exchange the document in specific contexts of operations management. The final part for Profile Specifications shows a method to apply the standard to each local situation.
The purpose of the OASIS Production Planning and Scheduling TC is to develop common object models and corresponding XML schemas for production planning and scheduling software, which can communicate with each other in order to establish collaborative planning and scheduling on intra and/or inter enterprises in manufacturing industries.
For more information, see the TC Charter and FAQ
Technical Work Produced by the Committee
PPS (Production Planning and Scheduling) , Committee Specification Ver1.0, September 29th, 2011, XML Schema
pps: the list used by TC members to conduct Committee work. TC membership required to post. TC members are automatically subscribed; the public may view archives.
pps-comment: a public mail list for providing input to the OASIS pps Technical Committee members. Send a comment or view archives.
Providing Feedback: OASIS welcomes feedback on its technical activities from potential users, developers, and others to better assure the interoperability and quality of OASIS work.