Do members of the PMRM TC approve PMRM v1.0 WD07 [1] as new Committee Specification Draft and requests that this new Committee Specification Draft also be submitted for a further 15-day Public Review?
The PMRM TC approves the latest draft (WD07):
[1] https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48732/PMRM-v1.0-wd07.pdf
as a new draft committee specification, drafted in response to the second public review
(http://docs.oasis-open.org/pmrm/PMRM/v1.0/csprd02/PMRM-v1.0-csprd02.pdf).
As this draft includes material changes to the previous public review draft, the TC requests that this new Committee Specification Draft also be submitted for a further 15-day Public Review.
The TC also notes that:
- the .pdf version referenced above is considered authoritative;
- the principal change is the inclusion of a Conformance section as required by the OASIS TC Process;
- an editable (.docx) version of the WD07 draft is available at: https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48733/PMRM-v1.0-wd07.docx
- for information, a ‘tracked changes’ version of the document is available at: https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48734/PMRM-v1.0-wd07-tracked.pdf
The TC instructs the chairs to proceed with the formal requests to TC Administration for creation of the new Committee Specification Draft and Committee Specification Public Review Draft.
|